| The
Operation A
swine and beef processing facility, with a capacity of 500-750
head per day, produced an effluent discharge of 30,000 gallons
per day. It was using a 40 hp turbine for aeration at a
cost for electricity of $2,000 per month. Chemical flocculants
were also required to contol solid build-up, at a cost of
$4,000 per month.
The Challenge
In 1997, a $700,000
wastewater remediation system from Europe was installed.
Solids build-up continued to the point that the pond was
95% crusted over and there were very strong odors with numerous
community complaints.

Click on thumbnail to view full-size image
THE O2 SOLUTION®
System was installed in June of 2001, and the results speak
for themselves:
PROJECT
#1 PRIMARY WASTEWATER POND
| |
BOD |
TSS |
DO |
| Date: |
(MG/L) |
(MG/L) |
(MG/L) |
| 05/09/01 |
286 |
3120 |
<0.1 |
AGSMART
SYSTEM INSTALLED JUNE, 2001
| |
BOD |
TSS |
DO |
| 09/04/02 |
82 |
1950 |
2.68 |
| Percentage |
71% |
38% |
268% |
| Change |
Reduction |
Reduction |
Increase |

Odor complaints
ceased to be an issue, and a community open house brought
many compliments.
|